Semiconductor Facility in New York

Semiconductor Facility

Integrated design fast-tracks a cutting-edge chip plant.

Project Facts

Location Confidential, New York
Owner Confidential
Size 2 million SF
Cost $1.9 billion
Status Under Construction

Overview

Walter P Moore served as the prime structural design consultant for a confidential chip fabrication plant, providing comprehensive structural engineering services. By integrating structural and construction engineering, we expedited the project timeline, allowing steel fabrication to begin before full design completion.

About the Project

Walter P Moore provided full structural engineering services and served as the prime structural design consultant on an integrated Design-Build team for a confidential chip fabrication plant and support buildings in New York.

Our integrated structural and construction engineering teams expedited the procurement and construction schedule by months. We produced LOD400 steel fabrication models concurrently with the structural design, allowing the steel to be fabricated before the entire building was fully designed and coordinated, thus saving valuable time.