S031402200 N36 large

Amegy Bank Corporate Headquarters

A prominent new landmark for Houston’s Uptown District supports company’s long-term goals

Project Facts

Location Houston, Texas
Owner Amegy Bank
Size 410,000 SF
Cost $139 million
Status Completed 2016
Certifications LEED Gold

Overview

The new Amegy Bank Corporate Headquarters stands proud among the Galleria area’s newest landmarks. Maximizing views of downtown Houston and the Galleria area, the gently curved glass facade and double-height daylight filled lobby add an abundance of natural light to the elegantly detailed interior while mitigating solar heat gain.

S031402200 N19 large

S031402200 N7 large

S031402200 N4 large

4149 panorama 8

1 / 1

About the Project

This 23 story cast-in-place concrete office and podium garage totals approximately 880,000 gross square feet on a prominent site along Loop 610 that overlooks Memorial Park to the east and Uptown Houston’s street scape to the west. Amegy’s previous Houston headquarters space is in Five Post Oak, a distinctive office tower near Uptown. Walter P Moore structurally designed that tower in 1982 in the height of Houston’s building boom, so our relationship has now come full circle with this new tower.

S031402200 N9 large

S031402200 N15 large

S031402200 N14 large

S031402200 N10 large

1 / 1

Rotated Elevator Core

Within the tower are 9 levels of parking with an 8 story podium extension providing 1,160 parking spaces. The mechanical penthouse and building maintenance unit at the top of the tower are concealed by cladding supported by a sloped steel ‘crown’ which peaks at 70-0” above the roof level. The uniquely rotated elevator core that is oriented 45 degrees from the grid of the almost square building and cantilevered beams at each tower corner allows for ideal corner office views. Walter P Moore also designed the building to support a 3 story tall cable net wall at the main lobby to create a striking entrance experience for patrons.